DDB REPAIR REFIT WHARF 2 SUBMARINE BASE KINGS BAY

July 13, 2015

Submarine Base Kings Bay, GA - This project will repair the Trident Refit Facility Wharf 2 at USNSB Kings Bay, Georgia. The work includes basic concrete restoration of spalled and racked concrete piles, pile caps, edge beams, mooring foundation and hardware, repair of catwalk, fender wraps, and bonding sytems. The project will replace ladders and scarification anodes. Additionally the work includes cathodic protection to be built in to the concrete structures to maintain the integrity of the repair and prevent further corrosion. The repairs will also include minor miscellaneous electrical work for power supply. 

Share on Facebook
Please reload

Featured Posts

Yard crew launches 60’x120’ JMC120 barge after hauling it out for refurbishment including structural steel repairs and marine epoxy paint and new zinc...

January 19, 2019

1/9
Please reload

Recent Posts
Please reload

Archive
Please reload

  • LinkedIn Social Icon
  • Facebook Social Icon
  • Twitter Social Icon

Copyright ©2019 Precon Marine. All rights reserved.