top of page
GUAM 1.jpg

GAUM

Installation of an Underwater Electro-Magnetic Measurement System (UEMMS) in support of
Pacific Fleet requirements to magnetically range all classes of USN surface ships and
submarines.

Completed 2023

Picture7.jpg

Replacement of parts to the Passive Waterfront Barrier (PWB) moorings at Naval Base Marianas, Guam. This barrier system protects the inner Apra Harbor.

Completed 2024

n8djl6ss12wa1_edited.jpg

The installation of six (6) 6” “Drill and Leave” conduits from the Alupang Beach area of the island out of approximately 4000 linear feet is needed to ultimately receive  data/telecommunications cables.  The diving tasks associated with this project included the removal of the drilling head from the drill stem followed by the installation of a pull-back line that will be used in the future to pull the data cables through the conduit. Diving depths approximately 147 feet of seawater (FSW)

Completed 2023

US_Navy_030225-N-0000X-002_An_aerial_view_of_Apra_Harbor_on_U.S._Naval_Base_Guam_is_seen_d

  The diving tasks associated with this project included  Removal of blind flange adapter, Installation of Bell Mouth & preparations of pulling rope, Removal of Bell Mouth, Installation of articulated pipe flange adapter, Installation 6m articulated pipe. Diving depths approximately 147 feet of seawater (FSW)

Completed 2024

63995bf7-e8c7-4090-86cf-34a07f747865_edi