North Carolina
POTASH CORPORATION OF SASKATCHEWAN, INC.
Barge Dock Repair
Morehead City, NC
Contract Value: $1,200,000
Project Manager(s): Robert Thomas
Work on this project requires the demolition and repair of existing concrete and wharf face, installation of new UHMW - PE and wheel fender, the replacement of existing timber curb with new plastic lumber, and the installation of pile jackets on spalled concrete piles.
EV WILLIAMS
Design-Build Rt. 13
HWY 13 Bridge over the Chowan Bridge
North Carolina
Contract Value: $1,200,000
Project Manager(s): Robert Thomas
Perform concrete repairs including the application of shotcrete and epoxy resin injection on both the superstructure and substructure. The majority of the work had to be performed from the water, thus increasing the challenges of construction.
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION
Shotcrete Repairs on Bridge #11 Oregon Inlet
Dare County, North Carolina
Contract Value: $331,250
Project Manager(s): Robert Thomas
Remove deteriorated and disintegrated concrete from substructure bent caps, columns, and struts in reasonably close conformity with the lines, depth and details shown on the plans. Work also includes cleaning reinforcing steel, removing all loose materials, removing and disposing of debris, and applying shotcrete.
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION
Ferry Ramp Rehabilitation - Hatteras Ferry Terminal
Dare County, NC
Contract Value: $1,517,490
Project Manager(s): Alan McKinnon
The work to be performed provides for cleaning & painting of 3 existing ramps and lift bents, steel repairs, and mechanical & electrical system upgrades.
US ARMY CORP OF ENGINEERS
South Jetty Repair, Masonboro Inlet
New Hanover County, NC
Contract Value: $4,937,400
Duration: 10 Months
Project Manager(s): Brian Magee
This project involves the repair of the Masonboro Inlet South Jetty which has settled and in need of repairs. Work includes the addition of approximately 32,500 tons of armor stone in order to rebuild the armor stone will be transported via barge from Norfolk to Wilmington, Armor stone being placed will be average 20 ton each. Placement of the massive stone will be handled by the 1250 Komatsu materials handler and grapple attachment.
POTASH CORPORATION OF SASKATCHEWAN, INC.
Barge Dock Repair
Morehead City, NC
Contract Value: $1,200,000
Project Manager(s): Robert Thomas
Work on this project requires the demolition and repair of existing concrete and wharf face, installation of new UHMW - PE and wheel fender, the replacement of existing timber curb with new plastic lumber, and the installation of pile jackets on spalled concrete piles.