Mortenson Construction
Kings Bay Sub Base, EHW 1:Repair 1
Kings Bay Sub Base, GA
Contract Value: $12,591, 634.00
Duration: s
Project Manager(s): Scott White
The project involves concrete rehabilitation of piles and the wharf deck, and repairs to steel waterfront structures and piles. Cathodic protection grout filled jackets will be installed on 687 concrete piles to repair corrosion spalls and provide future protection from corrosion. 192 steel fender pile will be repaired with epoxy and wrapped with a petroleum tape and fiberglass wrap for corrosion resistance and strengthening of the pile. Ancillary wharf structures and mooring hardware such as ladders, bits, capstans, and fender system will be replaced or repaired as required.