EV WILLIAMS

Design-Build Rt. 13
HWY 13 Bridge over the Chowan Bridge
North Carolina
Contract Value: $1,200,000
Project Manager(s): Robert Thomas

Perform concrete repairs including the application of shotcrete and epoxy resin injection on both the superstructure and substructure. The majority of the work had to be performed from the water, thus increasing the challenges of construction.  

1/5
  • LinkedIn Social Icon
  • Facebook Social Icon
  • Twitter Social Icon

Copyright ©2019 Precon Marine. All rights reserved.