NORFOLK SOUTHERN

Coal Pier #6 Bulkhead Replacement
Norfolk, VA
Contract Value: $4,237,691
Project Manager(s): Bryan Ellis

Project consist of the relocation of existing storm and water lines in order to accommodate the installation of 135 ft of Retaining Wall.  Upon the completion of the utility relocation, a retaining wall will be installed comprising of a  King Pile/Sheet Pile Combination section modulus with 107 ft long components. Approximately 30 ft. of the retaining wall and will installed under a low clearance area and during live pier loading operations and will require special means and methods.