City of Hampton (Factory Point)
Back River Dredging and Shoreline Restoration and Protection
Hampton, VA (Factory Point)
Contract Value: $3,753,250
Duration: 160 Days
Project Manager: Carlton Diggs
This project includes, but is not limited to, 29,170 CY of mechanical channel dredging, placement of 145,000 CY of fill material in order to increase the dune size, construction of 5 new stone breakwaters, as well as planting of 38,700 SY of dune grass.
See articles detailing this project:
Factory Point's white beaches prove a draw
Sand Dredging Operations will restore Factory Point