Company News Buckroe Beach Fishing Pier Project Begins
With all the soil sampling, design changes, and engineering done, test piles will be driven within days. Even as this article is being written, the piles for the pier are on their way to the project site. Weather delays are the "nature of the beast" when it comes to marine construction.
It seems like only days ago, on a sunny afternoon, we were holding the opening ceremony with many interested fishing enthusiasts and dignitaries in attendence. Brambleton Ave. Bridge Widening Nears Completion
We would like to thank eveyone for their patience during the repairs and widening of the Brambleton Ave. Bridge.
Although some inconviences were felt, be assured that these repairs were necessary, and have created a safer passage for both vehicular and pedestrian traffic alike. Chesapeake Bay Bridge Tunnel-Crossing Project
Protecting one of the world’s most unique water crossings can be a daunting task. It looks simple enough on paper, but working out in the Chesapeake Bay has its own challenges. Precon Marine, Inc. is meeting and exceeding those expectations to protect one of the largest water crossings in the world.
Precon Marine Aquires Lift-Boat, "Capt'n Ray"
The Capt'n Ray, a 1.2 million dollar investment, begins its work on the Chesapeake Bay Bridge project. For a closer look at this engineering marvel of its day, working on one of the largest engineered projects in the world, "Read More".
Peck Marine Terminal
Precon Marine is currently finishing construction on a 260' concrete pier serving as an extension to the existing 160' wharf.
TESORO CORPORATION DEPARTMENT OF THE NAVY
The Naval Weapons Station Yorktown – Cheatham Annex Facility (Cheatham Annex) is a 1,579-acre federal facility located outside of Williamsburg, in York County, Virginia. The facility is located adjacent to the York River, approximately 15 miles upstream of the Chesapeake Bay.
TIDEWATER SKANSKA, INC. MARYLAND DEPARTMENT OF TRANSPORTATION
During the process of constructing the new Woodrow Wilson Memorial Bridge connecting Virginia and Maryland over the Potomac River, the joint venture of Tidewater Skanska, Inc., Kiewit Construction Company and The Clark Construction Group, Inc., (TKC), awarded Precon Marine, Inc. a subcontract for the removal of underwater debris from the underside of the bridge pier caps.
|
||||