TESORO
CORPORATION
Precon
Marine, Inc. was contracted to perform the repairs to
Pier CAD-A at the Cheatham Annex. After a pre-construction survey was
conducted, Precon replaced 1,712 LF of timber piles, 490 BF of 3”x10”
timber bracing members and replaced a total of 1567 fiberglass bolts.
As part of the contract, all delaminated concrete was repaired with polymer
modified, cement-based, one component mortar; 72 SF of spall repairs on
top deck and 200 SF of spall repairs below deck. All concrete cracks were
cleaned and filled with polyurethane: a total of 166 feet of cracks below
deck were repaired. The top surface of the concrete deck was sealed with
a surface applied penetrating sealer and 10 expansion joints were replaced.
6230 SF of rail slots were filled with concrete and 22 life rings were
installed.
|
|||||
Website
designed and maintained by
Web
Teks, Inc. |
|||||