The steel sheet piles were blast cleaned utilizing a Pangborn Rotoblast Continuous Blast Cleaning System at the Precon Marine Chesapeake shop facility. Then an industrial coating was applied to the sheets in accordance with SSPC consensus standards. After the required drying time and inspection, the steel AZ & HZ pilings were loaded onto barges and transported to the marine terminal for installation. The project was completed
in September 2005.
|
|||||